国产午夜毛片V一区二区三区_日本乱码伦视频免费播放_亚洲高清乱码午夜电影网制服_久久精品国产亚洲AV天海翼,国产女人高潮抽搐喷水视频免费 ,欧产日产国色天香区日产免费片在线观看 ,午夜AV无码福利免费看网站,激情超大尺度秋霞影院午夜,91丨精品丨蝌蚪丨白丝jk,国产一区二区三区水蜜桃

Welcome to the official website of Jiangsu Tiangong Machinery Engineering Co., Ltd.!

Consulting Hotline:

+86-513-88405558
Hot Key Words:

Homogenizing equipment, bulk machine, discharge valve, ventilation valve, high temperature valve, other valves

Location: Home > News

News

NewsNews

N

Consultation hotline

+86-513-88405558

The main equipment of the cement plant, as well as its use and function

Author:Click:804 Release time:2016-12-15

1. Speaking of raw materials, limestone is transported from the mine into the factory via a belt conveyor.

2. After being crushed by a limestone crusher, it is transported to the limestone storage by a belt conveyor.

3. There is a bag filter in the middle dust point.

4. The batching station, limestone, sandstone, iron powder, fly ash (the process design is different, the raw materials may be slightly different) are sent to the raw material mill (now generally a vertical roller mill) through a belt scale and a belt conveyor.

5. After being ground, it is conveyed to the raw material storehouse through the air chute and bucket elevator.

6. The raw meal is sent to the preheater by the bucket elevator, and is preheated and decomposed into the kiln for calcination. The clinker is cooled by the grate cooler, crushed by the clinker crusher, and sent to the clinker warehouse by the chain conveyor.

7. Clinker, mixed materials, and gypsum are pulverized by a conveyor to a cement mill (ball mill), and the finished products are put into the cement warehouse, and then leave the factory through a packaging machine or in bulk.

8. There are also humidification towers (cooling and dust removal, improving dust specific resistance), electric dust collection (dust removal) and other equipment.


【Relevant recommendations】